Participation offer
Bramsche III, 4.2 MW solar, open to residents
4.25%
Fixed interest p.a.
7 years
Term
€500
Minimum
€2.8M
Volume
Sample content: the copy and figures on this page are fictional. The widget shows the offering behind the configured widget keys, and its terms and documents are the ones that apply.
The field sits on former grazing land east of the B68. Permits are granted, the grid connection is contracted, construction starts in spring.
Interest is paid annually. The loan is subordinated, which means a total loss is possible, read the information sheet before you sign anything.